-
tacklingsolidwallvoidedproperties wrote a new post, SAP calculation results, on the site Tackling Solid Wall Voided Properties 6 months, 2 weeks ago
The following was e-mailed to the client on 31st March 2011:
We have completed SAP calculations for the three properties both pre and post retrofit.
We have also produced a summary spreadsheet so that you can […]
-
tacklingsolidwallvoidedproperties wrote a new blog post: Handover of 21 Belmont Terrace (P1) and 4 Gordon St (P2) 1 year, 1 month ago
Handover of 21 Belmont Terrace (P1) and 4 Gordon St (P2) Met tenants for handover of these two properties. Lots of photos taken. NB – update on 4 Thomas St Planners missed the date for assessing the ASHP and PV application, but YHA think this was a blessing in disguise, as the original application would have been [...]